Project: LongWheelBase.
Day 3. (14-07-2002)

 
Here we removed the hood and the windscreen.
now it's ready for the seperation.
we used this engine-hoist to lift of the body.
it's pretty easy to do this.
now we can acces everything we want.
The LWB chassis can wait on this Opel Blitz.
(Also a Project vehicle.)
Ready for welding all the rusty holes.
and preparation for a 2" body-lift.